MANUAL APQP ESPAOL PDF

APQP Advanced Product Quality Planning In Consonance with the AIAG¶s (QS- ) APQP Manual Files Included In This Package The Red. in compliance with AIAG reference manual. It is a VOLVO requirement (incl. RTS, PAA, PHR) as specified in SQAM Pre-requisite: supplier is trained to APQP. GM APQP Kick Off and SRV Workbook-GM – Download as Excel Spreadsheet .xls /.xlsx), PDF File Bopp-Busch Quality Manual.

Author: Mikami Mezishicage
Country: Bulgaria
Language: English (Spanish)
Genre: Marketing
Published (Last): 2 June 2012
Pages: 447
PDF File Size: 4.31 Mb
ePub File Size: 3.65 Mb
ISBN: 565-1-11451-478-3
Downloads: 94545
Price: Free* [*Free Regsitration Required]
Uploader: Zugor

It is important to look at what they are attempting to do. Ford, GM and Chrysler. Advanced product quality planning APQP is a framework of procedures and techniques used to develop products in industryparticularly in the automotive industry.

APQP is utilized today by these three companies and some affiliates. Feedback, Assessment and Corrective Action The results of continuing production are evaluated for common or special causes of variation during this phase to ensure that the products satisfy customer satisfaction requirements The effectiveness of the quality process should be evaluated during this process step Includes continual improvement efforts Includes delivery and espsol performance Continuing Production Phase 5 Outputs Reduced variation Customer satisfaction Delivery and service Reducing Variation Identify process variation take corrective action to reduce variation Develop proposal appqp customer review Gain customer decision to implement, negotiate or change design Customer Satisfaction Product or service must perform in customers environment Supplier must participate Supplier and customer must be partners Reference QS Element 4.

Specifications of a component, material, assembly or vehicle assembly operation which are designated by Chrysler as being critical to function and having particular quality, reliability and durability significance. Those process parameters for which variation must be controlled around a target value to ensure that a significant characteristic is maintained at its target value.

Except for the Histogram animation, I have included a. Specifications which require special manufacturing control to espalo compliance with Chrysler or government vehicle safety requirements. Both computers have Shockwave and the Flash player installed, as well as the latest Quicktime. October Learn how and when to remove this template message.

Impact of Flow Diagram being incorporated into the Control Plan, if any. Through these phases 23 main topics will be monitored.

  CATERPILLAR 325DL PDF

APQP – [DOCX Document]

Product characteristic for which reasonably anticipated variation could significantly affect customer the products safety or its compliance with government regulations such as: This control is for this process step in the process flow which was evaluated for risk in this processFMEA line item. Less detail on Process Failure Modes. The process has the capability to produce product that meets requirements.

D Parts do not meet specs. Requirements – Deliverables Definition and specification – Criteria it must meet Market analysis – Expected annual production volume, length of run, start delivery target date, target price Japankey sales points, key competitors, etc.

The animation will now play continuous looping in the SlideShow Mode. Why Does it Matter?

Advanced product quality planning

The free download version of Quicktime http: On the Macintosh platform, the files play in Powerpoint like movies when in the Esaol mode.

Opens communication between Device and Process Engineers.

PFMEA and statistical data used to determine what additional controls necessary. As a trilogy, remember – the links must all match.

From Wikipedia, the free encyclopedia. Receiving has only Control Plans 3. This page was last edited on 27 Decemberat Any KPCs included in customer-released engineering requirements are provided as a starting point and do not affect the suppliers responsibility to review all aspects of the design, manufacturing process, and customer application and to determine additional KPCs. Please help improve this article by adding citations to reliable sources.

Management Support Report project status to management Recommend continue or drop project depending on feasibility Cover open issues and concerns Management support as required Subcontractor Pilot Build Supplier participated, if appropriate Sample quantity required Check that it is according to: Identify appropriate benchmark s Find reason for gap between your status and benchmark Develop a plan for closing gap, meeting or exceeding benchmark Product – Process Assumptions Assumptions FeaturesDesign Process concepts Technical innovations Advanced materials Reliability assessments New technology Document assumptions as part of project plan Utilize as inputs to plan Consider alternate paths in case assumptions do not play out Product Reliability Studies Frequency of repairs or replacements within designated time period s Repair or Throw-away?

  MALIFAUX RULEBOOK 1.5 PDF

To document and communicate initial process control Next: What must be on an FMEA? KCCs require ongoing monitoring per an approved Control Plan and should be considered as candidates for process improvement. Core team compilation of important product characteristics from all sources. Core team identified process variables input variables that have a cause and effect relationship with the identified Product Characteristic s which can only be measured at the time of occurrence.

Automotive industry Quality control. Process Documentation Work Instructions?

I develop on a Macintosh using Office At the time, the success of the Japanese automotive manuql was starting to be remarkable in the US market. Control Plans must address the flow of received materials and parts from receiving, through manufacturing and on to shipping and to warehouses.

Microsofts Photo Editor does not play well with animated gif files.

Advanced product quality planning – Wikipedia

The trilogy documents must precisely link to your process wspaol work instructions or however your company addresses this issue Document Links Document Links II One Document?

Tier 1 suppliers are typically required to follow APQP procedures and techniques and are also typically required to be audited and registered espapl IATF APQP is an attempt to ensure communication both within a company and between a company and their customer. Limited to highlighting Critical characteristics on Production part drawings, tools and fixture, and tooling aid procedures where ongoing process control is not automatically mandated.

More difficult to identify critical processes. Guidance in controlling processes and to ensure product quality Last: E Parts do not meet specs maanual vehicles with class E parts require retrofit to make them saleable. APQP is an attempt to provide a common path and synchronization of product development activities.

These teams manuaal use appropriate techniques identified in the Advanced Product Quality Planning and Control Plan reference manual. You have to look at the intent and you must identify equivalencies within your companys systems and documentation.

Unsourced material may be challenged and removed.