ASTM C172 PDF

ASTM C Related for sampling of fresh concrete on which tests are to be performed to determine compliance with specific test methods in ASTM standards . Materials. Sampling. Testing. C Cement. C Agg. C Air. C Admix. C Ash. C Water. C Sampling Fresh Concrete. ACI C Sampling Freshly Mixed Concrete – Free download as PDF File 1 This practice is under the jurisdiction of ASTM Committee C09 on Concrete.

Author: Vudohn Moogulkree
Country: Swaziland
Language: English (Spanish)
Genre: Sex
Published (Last): 17 May 2014
Pages: 94
PDF File Size: 16.28 Mb
ePub File Size: 10.9 Mb
ISBN: 503-2-21228-659-7
Downloads: 29208
Price: Free* [*Free Regsitration Required]
Uploader: Akikus

Obtain these portions within the time limit specified in Section 4. This shall be done before remixing. Sample by repeatedly passing a receptacle through c1722 entire discharge stream or by completely diverting the discharge into a sample container. Expeditiously obtain and use the sample and protect the sample from ast sun, wind, and other sources of rapid evaporation, and from contamination.

These requirements apply to both tilting and nontilting mixers. Combining values from the two systems may result in non-conformance with the standard. Start molding specimens for strength tests within 15 min after fabricating the composite sample. After removing the larger aggregate particles by wet-sieving remix the batch with a shovel the minimum amount necessary to ensure uniformity and proceed testing immediately. Generally, a horizontal back and forth motion is awtm.

It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

Warning —Fresh hydraulic cementitious mixtures are caustic and may cause chemical burns to skin and tissue upon prolonged exposure. The containers shall be of a size sufficient to provide a composite sample size that is in agreement with the maximum aggregate size.

Agitators—Sample the concrete by collecting zstm or more portions taken at regularly spaced intervals during discharge of the middle portion of the batch.

ASTM C172 – Sampling Fresh Concrete

Parte 1 de 2 Designation: Users of this standard are expressly advised that determination of the validity of any such patent ast, and the risk of infringement of such rights, are entirely their own responsibility. Complete these tests expeditiously.

  DL365 G5 QUICKSPECS PDF

This removal of larger aggregate particles is preferably accomplished by wet-sieving. A number in parentheses indicates the year of last reapproval.

ASTM C Standard

Link to Active This link will always route to the current Active version of the standard. Perform sampling by passing a receptacle completely through the discharge stream, or by completely diverting the discharge into a sample container. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. To preclude contamination or absorption by the subgrade, sample the concrete by placing three shallow containers on the subgrade and discharging the concrete across the container.

Shake or vibrate the sieve by hand or mechanical means until no undersize material remains on the sieve. Adtm samples are not prohibited for routine air content, temperature, and slump tests. This removal of larger aggregate particles is preferably accomplished by wet-sieving. Scrape any mortar adhering to the sides of the wet-sieving equipment into the batch. NOTE 2—Sampling should normally be performed astn the concrete is delivered from the mixer to the conveying vehicle used to transport the concrete to the forms; however, specifications may require other points of sampling, such as the discharge of a concrete pump.

NOTE 4—In some instances, the containers may have to be supported above the subgrade to prevent displacement during discharge. Regulate the rate of discharge of the batch by the rate of revolution of the drum and not by the size of the gate opening. This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and if not revised, either reapproved or withdrawn. Sample the concrete at the frequency specified by collecting two or more portions taken at regularly spaced intervals during discharge of the concrete.

Individual reprints single or multiple copies of this standard may be obtained by contacting ASTM at the above address or at phonefaxor service astm. Current edition approved Oct.

NOTE 5—The waiting period prior to commencing the testing is needed because the mix water is input only seconds before discharge from the continuous mixer.

  BAGDAD KAVITHA LYRICS PDF

A superscript epsilon indicates an editorial change since the last revision or reapproval. Place only enough concrete on the sieve at any one time so that after sieving, the thickness of the layer of retained aggregate is not more than one particle thick. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other.

The equipment shall be capable of rapidly and effectively removing the designated size of aggregate. The apparent strength of wet-sieved concrete in smaller specimens is usually greater than that of the total concrete in larger appropriate size specimens. After obtaining the composite sample, wait a minimum of 2 minutes and a maximum of 5 minutes before beginning tests Note 5. NOTE 6—The effect of wet-sieving on the test results should be considered.

ASTM C | Testing Services | Standard Practice for Sampling Freshly Mixed Concrete

The air content of the wet-sieved fraction of concrete is greater than that of the total concrete because the larger size aggregate which is removed does not contain air. Due to the difficulty of determining the actual quantity of concrete discharged, the intent is to provide samples that are representative of widely separated portions, but not the beginning and the end of the load.

They shall be combined and remixed with a shovel the minimum amount necessary to ensure uniformity and compliance with the maximum time limits specified in 4. Historical Version s – view previous versions of standard. Approved October 1, ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned in this standard.

Avoid contamination with subgrade material or prolonged contact with and absorptive subgrade. Take the portions so obtained within the time limit specified in Section 4, and combine them into one composite sample for test purposes. Warning—Fresh hydraulic cementitious mixtures are caustic and may cause chemical burns to skin and tissue upon prolonged exposure.