AFI 63-501 PDF

Instruction (AFI) _IP, Management Of Aviation Critical Safety Items; Air Force Policy. Directive , AFMC Quality Assurance; and. Find the most up-to-date version of AFI at Engineering Additionally, this AF Instruction (AFI) implements the policies in management is contained in AFI , Air Force Acquisition Quality.

Author: Tojabei Volmaran
Country: Romania
Language: English (Spanish)
Genre: History
Published (Last): 7 September 2011
Pages: 443
PDF File Size: 17.12 Mb
ePub File Size: 10.64 Mb
ISBN: 415-5-83784-726-5
Downloads: 34110
Price: Free* [*Free Regsitration Required]
Uploader: Akinora

Product design consists of two broad phases that may overlap in execution: Address, in the verification strategy, the technical approach to product verification and the specific approaches that will be used to verify that work products meet their specified requirements.

Maintain all required certifications. Develop cost and schedule estimates of the project work products. Well defined parameters provide common and consistent criteria for analyzing, prioritizing and mitigating the risks to be managed. DG1P5 Analyze and select product-component solutions that best satisfy the established criteria Description: Risks must be identified and described before they can be analyzed and managed properly. The configuration ati change management system enables the disciplined management and control of changes to the product and related work products.

In addition to the tailoring of practices previously described under paragraph 2. Solutions, designs, and implementations encompass products, product components, and product-related life-cycle processes either singly or in combinations as appropriate. Core metrics should be supplemented with additional software metrics as appropriate, including emphasis 63-510 complexity of the software to be developed, wfi capability and productivity rather than simply quantity, etc.

If corrective action is required to resolve variances from project plans, these actions should be defined and tracked to closure.

  BOROWSKI THIS WAY FOR THE GAS LADIES AND GENTLEMEN PDF

Bidirectional traceability ensures that all higher level requirements and verification criteria ai accounted for by the totality of the lower level requirements. Prepare a transition plan to be used by the suppliers during the early phases of development to support tradeoff decisions which can have a significant impact on production. As early as possible in development, proof of manufacturing models should be used to establish that planned production processes and procedures are compatible with the design.

Defense Acquisition Guide Other Considerations: Regular use of decision-making criteria, afu for less significant decisions, can be extremely helpful in creating a practice for disciplined decision making. Establish and maintain integrated teams based on a product oriented hierarchy.

As each level of the product is defined, there is an iterative process of allocation, high-level design, and requirements definition for the next-lower level.

Establish mechanisms for eliciting, coordinating, and formalizing operational sfi and constraints.

TO D 01SEP USAF DEFICIENCY REPORTING

It is customary that validation teams be comprised of members who were not previously involved in the self-assessment, and whenever possible members will not be from the same organization. Ensure that there is accountability for performing the process and achieving the specified results throughout the life of the process.

Posting Results – E Information is compiled as directed by local policy and procedures. Perform process reviews to provide recommendations for policy, process, and resources to facilitate improvement.

Looking for other ways to read this?

Identify and maintain criteria for assigning enhancements responsibility. When an aggregate risk is formed by a roll up of lower level risks, care must be taken to ensure that important lower level risks are not ignored.

  CHORDATE EMBRYOLOGY BY VERMA AND AGARWAL PDF

Identify the policies which must be implemented to manage the failure modes which could cause the functional failure of the product in agi e. This control includes tracking the configuration of each of the configuration items, approving a new configuration if necessary, and updating the baseline.

Deliverables from an external project e. RG1P1 Elicit stakeholder needs, expectations, constraints, and interfaces Description: Product verification activities are routinely conducted throughout the entire contract performance period, and results are analyzed to determine acceptability of the products.

This process may begin with analysis and simulations e. To search the entire text of avi book, type in your search term here and press Enter. TFSG1 Prepare to support operations, maintenance, repair, and disposal of the product.

Specify how measurement data will be obtained, stored, updated and aafi. The goal is to provide various levels of organizational leadership with: Plan activities and establish criteria for assessing, validating, and transitioning emerging technologies. Periodically review all interface descriptions for coverage and completeness.

zfi Review the process for developing the project data. Conduct FAI inspection and verification on a representative item from the first production run of a new part, or following any change that invalidates the previous first article inspection result. A peer review is a method for conducting verification of work products during their development that has had great success in detecting defects, especially in documents for requirements and design.

Ensure collaboration among interfacing teams.